Aspen SVP3 – Fred Sterile Facility

,

Our team successfully delivered the new Fred Sterile Suite, one of three sterile suites being delivered by CLS as part of the SVP3 project for Aspen in Gqeberha. We thank the Aspen team, our dedicated subcontractors, and all CLS colleagues for their commitment and collaboration in delivering another world-class life sciences facility in record time.

Project at a Glance

Timeline

  • Construction period: October 2024 – September 2025

Facility Specifications

  • Use: Sterile Formulation and Fill
  • Classification: Grade A Isolator Filling in Grade C
  • Area: 2 865 m²

Environmental Conditions

  • Temperature: 18 – 23 °C
  • Relative Humidity: ≤ 55%
  • Automation: Full BMS integration with Environmental Monitoring via VEMS

Installed Equipment

Formulation System by Calibre Life Science

  • 7 vessel system (65 L to 3,000 L)
  • Fully integrated PUPSIT with Automated filter integrity testing
  • CIP Skid and Full SIP capability
  • Fully automated batching control system, compliant with ISA-88 and 21 CFR Part 11

Other

  • Fully integrated filler line with Isolator (Syntegon)
  • Parts Washer & Autoclave (Steris)
  • Stopper and Cap Processing System (Tofflon)

Services Rendered

Facility, HVAC, Automation, Electrical, Mechanical, Validation, Process, 3d Modelling and Drafting, Civil and Structural, Contract and Financial Management, Project Management, Build Management, GMP Advisory Services.